I just bought a MIJ charvel body and want to add pickup rings(I know that I will have to have short pickup adjustment screws). What's the best way to get the rings straight to drill the holes?
Announcement
Collapse
No announcement yet.
Adding pickup rings to a direct mount body
Collapse
X
-
My way... Don't know if it's the best.
Anyway, to get the rings straight, I use three strips of 2" masking tape. I go across the neck-side edge of the bridge PU and the bridge side of the neck PU, and then one strip along the bottom. This gives you a 90-degree "corner" at each pickup to use as a guide to keeping the ring straight.
Put the tape approximately 3/8" from the route edge on the bottom and 1/4" on the front/back strips, you want the edge of the tape to be visible when the ring is actually in place, with just a small gap so you can slide it around to line it up with the strings.
BTW instead of using short adjustment screws I just drill a 1/4" hole about 1/2" deep where the old direct mount screw is. It's pretty foolproof if you put some tape on your drill bit.
-
I'm not sure what you mean... You mean like get a long screw and run it through the ring and then through the pickup and then the pickup?
Or just to get it laid out for drilling the 4 regular screws?
I don't know if I'd count on those direct mount holes being in the right spot or not.
Comment
Comment